home *** CD-ROM | disk | FTP | other *** search
/ Shareware Grab Bag / Shareware Grab Bag.iso / 005 / pcpm.arc / PCPM.DOC < prev   
Encoding:
Text File  |  1985-06-04  |  81.3 KB  |  2,793 lines

  1. .MT0
  2. .MB0
  3.  
  4.  
  5.  
  6.  
  7.  
  8.  
  9.  
  10.                   PPPPPP     CCCCCC   PPPPPP    M     M
  11.                   P     P   C         P     P   MM   MM
  12.                   P     P   C         P     P   M M M M
  13.                   P     P   C         P     P   M  M  M
  14.                   PPPPPP    C         PPPPPP    M  M  M
  15.                   P         C         P         M     M
  16.                   P         C         P         M     M
  17.                   P         C         P         M     M
  18.                   P          CCCCCC   P         M     M
  19.  
  20.  
  21.  
  22.  
  23.  
  24.  
  25.  
  26.  
  27.  
  28.  
  29.                   PERSONAL COMPUTER PROJECT MANAGEMENT
  30.  
  31.  
  32.  
  33.  
  34.  
  35.  
  36.  
  37.  
  38.  
  39.  
  40.                               PREPARED BY:
  41.  
  42.                               Len Shepard
  43.                     444 North 3rd Street, Suite 201
  44.                          Sacramento, CA  95814
  45.                              (916) 446-1615
  46.  
  47.  
  48.  
  49.  
  50.  
  51.  
  52.  
  53.  
  54.  
  55.  
  56.                            November 21, 1984
  57.  
  58.  
  59.  
  60.  
  61.  
  62.  
  63.  
  64.  
  65.  
  66.  
  67.  
  68.  
  69. è
  70.  
  71.                            TABLE OF CONTENTS
  72.  
  73.  
  74.                                                               Page
  75.  
  76.                             I.  INTRODUCTION
  77.  
  78.        A.  PREPARATION
  79.  
  80.           1.  The Node Network                                  1
  81.  
  82.           2.  The Input Worksheet                               1
  83.  
  84.        B.  ENTERING THE BASE FILE                               2
  85.  
  86.        C.  SYSTEM GENERATED FILES                               2
  87.  
  88.        D.  CHANGING THE INPUT FILE                              2
  89.  
  90.  
  91.   II.  SAMPLE SESSION RUNNING PCPM                              3
  92.  
  93.        A.  Creation of Sample File                              4
  94.  
  95.             1 - INFORMATION                                     4
  96.             2 - ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE         5
  97.             3 - ENTER/CHANGE INPUT FILE                         7
  98.  
  99.                 Change Project Title                            7
  100.                 Input/Add Activities                            9
  101.                 Delete Activities                              10
  102.                 Change Activity Data                           12
  103.                 Change Time Period Units                       14
  104.                 Change Start Date                              15
  105.                 Inspect Input File                             16
  106.                 Check Node Connections                         18
  107.                 Sort and File Input                            19
  108.                 Filing Changes                                 20
  109.  
  110.             4 - CREATE/CHANGE HOLIDAYS                         22
  111.             5 - PERFORM CRITICAL PATH ANALYSIS                 24
  112.             6 - PERFORM CASH FLOW ANALYSIS                     25
  113.             7 - PRODUCE BAR CHARTS                             26
  114.             8 - SORT OUTPUT                                    28
  115.             9 - EXTRACT OUTPUT BY SUBCONTRACTOR                30
  116.  
  117.  
  118.  
  119.  
  120.  
  121.  
  122.  
  123.  
  124.  
  125.  
  126.  
  127.  
  128.  
  129.  
  130.  
  131.  
  132.  
  133.  
  134.  
  135. è
  136.                                                               Page
  137.                                                               ____
  138.  
  139.            10 - CHECK NODE NUMBERS                             31
  140.            11 - PRECEDENCE OR SUCCEEDENCE DISPLAY              32
  141.            12 - CONVERT WORKING DAYS TO PROJECT DAYS           33
  142.            13 - GENERATE CURRENT COST REPORT                   34
  143.            14 - CHANGE ALL NODE NUMBERS                        35
  144.            15 - CONSOLIDATE UPDATE FILES TO INPUT FILES        36
  145.  
  146.            EXITING PCPM                                        37
  147.  
  148.  III.  SYSTEM ERRORS                                           38
  149.  
  150.  
  151.    IV.  OUTPUT
  152.  
  153.        A.  Primary                                             39
  154.  
  155.        B.  Cash Flow Analysis                                  39
  156.  
  157.        C.  Barchart                                            39
  158.  
  159.        D.  Current Cost Report                                 39
  160.  
  161.        E.  Preceeder or Succeeder Display                      39
  162.  
  163.   V.  APPENDIX
  164.  
  165.        A.  Sample Input Form                                   40
  166.  
  167.  
  168.  
  169.  
  170.  
  171.  
  172.  
  173.  
  174.  
  175.  
  176.  
  177.  
  178.  
  179.  
  180.  
  181.  
  182.  
  183.  
  184.  
  185.  
  186.  
  187.  
  188.  
  189.  
  190.  
  191.  
  192.  
  193.  
  194.  
  195.  
  196.  
  197.  
  198.  
  199.  
  200.  
  201. è
  202.  PC PROJECT MANAGEMENT               1                     USER'S MANUAL
  203.  
  204.  
  205.  
  206.                             I.  INTRODUCTION
  207.  
  208.  
  209.  PCPM is  a  system of interactive programs for project management using
  210.  the critical path  method.   The  system  is  designed  to  handle  all
  211.  necessary functions  internally or allow the more sophisticated user to
  212.  build and modify files on his/her own by making use of  system  editing
  213.  software.  PCPM is menu-driven, that is, a menu of available options is
  214.  displayed to  the  terminal  for the user to choose the desired option.
  215.  When that particular function  has  been  completed,  PCPM  will  again
  216.  display the menu.
  217.  
  218.  A.  PREPARATION
  219.  
  220.      1.  The_Node_Network
  221.  
  222.          To use PCPM the user must first have constructed a node network
  223.          representation of  the  project.   Each  activity  must  have a
  224.          description of up to 30 characters, a duration (time), and node
  225.          numbers.
  226.  
  227.          The node network numbering must  be  performed  in  a  specific
  228.          fashion.  Each  node  is  assigned  an integer number from 1 to
  229.          1000 and nodes are numbered in ascending order with  the  first
  230.          node having  the  lowest  number  and  the last node having the
  231.          highest number.  The "from" node for each activity must be less
  232.          than (and not equal to) the "to" node for that activity.   Note
  233.          that not  all  numbers  between the start and finish have to be
  234.          used;  in fact, spacing  should  be  maintained  to  allow  for
  235.          future schedule changes.
  236.  
  237.      2.  The_Input_Worksheet
  238.  
  239.          Before input  at  the  terminal  is attempted, it is helpful to
  240.          make an input worksheet.  Enter the information from  the  node
  241.          network.  (See samples in the appendix).
  242.  
  243.          Optional entries  for each activity are the report finish date,
  244.          percent complete, subcontractor name/code or other comment, and
  245.          activity cost.
  246.  
  247.          Any report finish date entered must be "legal".  To be legal  a
  248.          date can  not fall on a weekend or holiday when working days is
  249.          the unit of time being used.  Also, a legal  date  can  not  be
  250.          prior to the start date of the project.
  251.  
  252.          PCPM may  be run using any unit of time the user specifies.  It
  253.          is, however, up to the user to maintain consistency  of  input.
  254.          Examples of possibilites are:
  255.  
  256.               Working days (does include weekends but not holidays).
  257.  
  258.               Calendar days (does not include holidays).
  259.  
  260.  
  261.  
  262.  
  263.  
  264.  
  265.  
  266.  
  267. è
  268.  PC PROJECT MANAGEMENT               2                     USER'S MANUAL
  269.  
  270.  
  271.  
  272.               Weeks (activity duration must be converted by the
  273.               user - e.g., 10 days duration should be entered as 2).
  274.  
  275.  B.  ENTERING_THE_BASE_FILE
  276.  
  277.      Using PCPM,  a  sample  input file such as that on pages 4-5 can be
  278.      created.  Other functions, including creation of  a  holiday  file,
  279.      critical path  and  cash flow analyses, and sorting output are also
  280.      performed by using PCPM.
  281.  
  282.      The user is guided interactively through each option of  the  menu.
  283.      After each option is complete, the system returns to the menu.
  284.  
  285.  C.  SYSTEM_GENERATED_FILES
  286.  
  287.      Accessory files  to  the input file are created by the system based
  288.      upon the input file.  It is, therefore, important that this file be
  289.      accurately entered.  In general, the existence  of  system  created
  290.      files can  be  ignored  by  the  user.  They are merely cogs in the
  291.      machinery that allows PCPM to run.  The  following  information  is
  292.      included to satisfy the more curious users.
  293.  
  294.      As options of the Main  Menu  are  performed,  the  system  creates
  295.      accessory files.  These accessory files are described with the base
  296.      file  name  and  a  three  letter  extension.   For  example,  when
  297.      utilizing OPTION 4 - CREATE/CHANGE  HOLIDAYS,  the  system  creates
  298.      (automatically) a file denoted by BASEFILENAME.HOL.
  299.  
  300.      Here are  some  of the system created files for example file "LLP":
  301.  
  302.          LLP.CFA   - output file for cash flow analysis
  303.          LLP.CPM   - input file for option 5 (main file)
  304.          LLP.CST   - output file for current cost report
  305.          LLP.DAY   - file of working vs. project days from Option 12
  306.          LLP.HOL   - file of holidays created by Option 3
  307.          LLP.LGS   - file of data for sorts used by Options 6,7,8, & 9
  308.          LLP.PRE   - output file containing predecessor printout
  309.          LLP.SRT   - sorted output file created by option 8
  310.          LLP.SUC   - output file containing successor printout
  311.          LLP.UPD   - updated input file created by Option 5
  312.  
  313.  D.  CHANGING_THE_INPUT_FILE
  314.  
  315.  
  316.      Changing the  input  file  is  easily   done   by   changing   node
  317.      connections, durations,  and/or  adding  report finish dates.  Once
  318.      the modifications to the input file are made, rerun Option 5.   The
  319.      system will quickly calculate the new durations, critical path, and
  320.      completion times.
  321.  
  322.  
  323.  
  324.  
  325.  
  326.  
  327.  
  328.  
  329.  
  330.  
  331.  
  332.  
  333. è
  334.  PC PROJECT MANAGEMENT               3                     USER'S MANUAL
  335.  
  336.  
  337.                     II.  SAMPLE SESSION RUNNING PCPM
  338.  
  339.  The following is a sample of what the completed input file, called LLP,
  340.  looks like.
  341.  
  342.  P&L CONSTRUCTION PROJECT
  343.  1,MOBILIZATION,500,510,2,1,0,0,0,1,0
  344.  2,GRADE & CLEAR SITE,510,520,5,4,0,0,0,2,0
  345.  3,REBAR PIERS,520,530,5,9,0,0,0,3,0
  346.  4,POUR PIERS,530,550,5,0,0,0,0,4,0
  347.  5,EXCAVATE FOUNDATIONS,550,560,8,8,0,0,0,5,0
  348.  6,REBAR FOUNDATIONS,560,570,5,5,0,0,0,6,0
  349.  7,ANCHOR BOLTS,570,580,2,2,0,0,0,7,0
  350.  8,POUR & CURE FOUNDATIONS,580,585,5,5,0,0,0,8,0
  351.  9,STRUCTURAL STEEL,585,587,10,10,0,0,0,9,0
  352.  10,DECK FILL CONC.,590,600,15,15,0,0,0,10,0
  353.  11,WELD STRUCTURAL,587,595,20,20,0,0,0,11,0
  354.  12,FIRE PROOFING,620,625,5,5,0,0,0,12,0
  355.  13,PRECAST PANELS,625,650,20,20,0,0,0,13,0
  356.  14,P.M. FRAMES,600,790,2,2,0,0,0,14,0
  357.  15,WALL FRAMING,600,790,20,20,0,0,0,15,0
  358.  16,SHEET METAL DUCTWORK,600,955,40,40,0,0,0,16,0
  359.  17,ELEC. RGH. IN,620,640,10,10,0,0,0,17,0
  360.  18,MAIN ELEC PANEL,640,790,10,10,0,0,0,18,0
  361.  19,PLUMING RGH IN,620,630,5,5,0,0,0,19,0
  362.  20,POUR S.O.G.,630,790,8,8,0,0,0,20,0
  363.  21,STAIRCASES,585,590,25,25,0,0,0,21,0
  364.  22,PLUMB. TOP OUT,630,890,10,10,0,0,0,22,0
  365.  23,ELEC. PULL WIRE & POWER,640,760,10,10,0,0,0,23,0
  366.  24,ELEC. FIXTURES/SWITCHES/PLUGS,760,960,5,5,0,0,0,24,0
  367.  25,STAIR FILL,597,710,10,10,0,0,0,25,0
  368.  26,INSULATION,790,800,2,2,0,0,0,1,0
  369.  27,DRYWALL,800,810,10,10,0,0,0,27,0
  370.  28,CERAMIC TILE,810,850,20,20,0,0,0,28,0
  371.  29,PAINT INTERIOR,810,860,10,10,0,0,0,29,0
  372.  30,DUMMY,860,870,0,0,0,0,0,30,0
  373.  31,STAIN DOORS,870,920,5,5,0,0,0,31,0
  374.  32,FINISH HARDWARE,920,960,5,5,0,0,0,32,0
  375.  33,METAL SIDING,650,890,2,2,0,0,0,33,0
  376.  34,ACCESS LADDER,950,960,1,1,0,0,0,34,0
  377.  35,REGISTERS & GRILLS,955,957,5,5,0,0,0,35,0
  378.  36,BALANCE H.V.A.C.,957,960,2,2,0,0,0,36,0
  379.  37,TOILET FIXTURES,850,910,5,5,0,0,0,37,0
  380.  38,TOILET PARTITIONS,910,940,2,2,0,0,0,38,0
  381.  39,PAINT STAIRS,710,960,3,3,0,0,0,39,0
  382.  40,CURBS & SIDEWALKS,650,960,5,5,0,0,0,40,0
  383.  41,FINAL CLEAN UP,960,970,2,2,0,0,0,41,0
  384.  42,DUMMY,600,620,0,0,0,0,0,42,0
  385.  43,ROOF HATCH,890,950,1,1,0,0,0,43,0
  386.  44,DUMMY,587,590,10,10,0,0,0,44,0
  387.  45,METAL DECK WELD,587,597,25,25,0,0,0,45,0
  388.  46,DUMMY,810,955,0,0,0,0,0,46,0
  389.  47,DUMMY,595,597,5,5,0,0,0,47,0
  390.  48,TOILET ACCESSORIES 0,940,960,2,2,0,0,0,48,0
  391.  
  392.  
  393.  
  394.  
  395.  
  396.  
  397.  
  398.  
  399. è
  400.  PC PROJECT MANAGEMENT               4                     USER'S MANUAL
  401.  
  402.  
  403.  A.  CREATION_OF_THE_INPUT_FILE_"LLP"
  404.  
  405.  The following  is  an  actual  session  which you can duplicate on your
  406.  computer.  User responses are underlined.  Remember to use  UPPER  CASE
  407.  responses only.  Comments and explanations are indicated by "/*".
  408.    
  409.                          OPTION_1_-_INFORMATION
  410.  
  411.  A> PCPM
  412.  
  413.  Copyright information  shows  on  the  screen.   Press the space bar to
  414.  continue running PCPM.
  415.  
  416.                          MENU OF PCPM PROGRAMS
  417.  
  418.               EXIT PCPM SYSTEM                           -  0
  419.               INFORMATION                                -  1
  420.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  421.               ENTER/CHANGE INPUT FILE                    -  3
  422.               ENTER/CHANGE HOLIDAYS                      -  4
  423.               PERFORM CRITICAL PATH ANALYSIS             -  5
  424.               PERFORM CASH FLOW ANALYSIS                 -  6
  425.               PRODUCE BAR CHARTS                         -  7
  426.               SORT OUTPUT                                -  8
  427.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  428.               CHECK NODE NUMBERS                         - 10
  429.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  430.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  431.               GENERATE CURRENT COST REPORT               - 13
  432.               CHANGE ALL NODE NUMBERS                    - 14
  433.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  434.  
  435.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER  _1_
  436.  
  437.                   INFORMATION ON THE PCPM SYSTEM
  438.  
  439.  PCPM is a menu driven Critical Path  Method.   Several  utilities  make
  440.  this system  a valuable tool for project management.  Input can be done
  441.  interactively in PCPM or be edited outside the PCPM system using  EDLIN
  442.  (IBM) or EDCOL (P&L).
  443.  
  444.  Using PCPM, you are guided interactively through each menu option.   As
  445.  each function is completed the screen returns to the main menu.
  446.  
  447.  Information and  messages  from  the  system  are  displayed  in   CAPS
  448.  surrounded by  "****".   User  responses  should  be made in UPPER CASE
  449.  LETTERS only.  Answers to prompts are  provided  in  paranthesis,  like
  450.  (Y/N).  The first answer (Y) is the default (<CR> key) answer.
  451.  
  452.  For detailed information refer to the PCPM USERS  MANUAL.   If  further
  453.  assistance is needed, call (916) 446-1613.
  454.  
  455.  Hit ENTER when you are ready to return to the main menu.  <CR>
  456.  
  457.  
  458.  
  459.  
  460.  
  461.  
  462.  
  463.  
  464.  
  465. è
  466.  PC PROJECT MANAGEMENT               5                     USER'S MANUAL
  467.  
  468.  
  469.  
  470.            OPTION_2_-_ENTER/CHANGE_SUBCONTRACTOR/COMMENT_FILE
  471.  
  472.                          MENU OF PCPM PROGRAMS
  473.  
  474.               EXIT PCPM SYSTEM                           -  0
  475.               INFORMATION                                -  1
  476.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  477.               ENTER/CHANGE INPUT FILE                    -  3
  478.               ENTER/CHANGE HOLIDAYS                      -  4
  479.               PERFORM CRITICAL PATH ANALYSIS             -  5
  480.               PERFORM CASH FLOW ANALYSIS                 -  6
  481.               PRODUCE BAR CHARTS                         -  7
  482.               SORT OUTPUT                                -  8
  483.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  484.               CHECK NODE NUMBERS                         - 10
  485.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  486.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  487.               GENERATE CURRENT COST REPORT               - 13
  488.               CHANGE ALL NODE NUMBERS                    - 14
  489.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  490.  
  491.  CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER 2
  492.  
  493.  Enter the name of the input file [.CPM] ? LLP
  494.  
  495.  Project: P&L CONSTRUCTION                          File: LLP.CPM
  496.  Time Period Units: WORKING DAYS   Sub. Codes: 48   Start Date: 070183
  497.  
  498.                                    SUBCONTRACTOR/COMMENT CODES
  499.  
  500.  Add, Change, Delete            1 WILSON    17 MACFORD    33 KRENCHIK
  501.  or Quit (A/C/D/Q) ? D          2 JONES     18 MCCALL     34 LEACH
  502.                                 3 MILLER    19 TRAMMEL    35 FREEHAN
  503.  Enter Code number              4 ARCHS     20 WHITE      36 TRESH
  504.  or 0 to exit ? 24              5 LEMON     21 CABELL     37 WERST
  505.                                 6 BUGMAN    22 BROOK      38 LOLICH
  506.  Enter Code number              7 SHECK     23 GIBSON     39 BUNNING
  507.  or 0 to exit ? 0               8 WILLIS    24 GENET      40 MCLAIN
  508.                                 9 MEAD      25 KALINE     41 NORTHRUP
  509.                                10 KNOUS     26 WILSON     42 STANLEY
  510.                                11 HOM       27 PARR       43 OYLER
  511.                                12 HEDIN     28 MORRIS     44 CASH
  512.                                13 ROBER     29 BEREN      45 WOCKFUSS
  513.                                14 MAST      30 WILCOX     46 GRUBB
  514.                                15 JONEY     31 LOPEZ      47 COBB
  515.                                16 FURRER    32 BAIR       48 GRENBERG
  516.  
  517.  
  518.  
  519.  
  520.  
  521.  
  522.  
  523.  
  524.  
  525.  
  526.  
  527.  
  528.  
  529.  
  530.  
  531. è
  532.  PC PROJECT MANAGEMENT               6                     USER'S MANUAL
  533.  
  534.  
  535.  
  536.  Project: P&L CONSTRUCTION                          File: LLP.CPM
  537.  Time Period Units: WORKING DAYS   Sub. Codes: 48   Start Date: 070183
  538.  
  539.                                    SUBCONTRACTOR/COMMENT CODES
  540.  
  541.  Add, Change, Delete            1 WILSON    17 MACFORD    33 KRENCHIK
  542.  or Quit (A/C/D/Q) ? C          2 JONES     18 MCCALL     34 LEACH
  543.                                 3 MILLER    19 TRAMMEL    35 FREEHAN
  544.  Enter Code number              4 ARCHS     20 WHITE      36 TRESH
  545.  or 0 to exit ? 8               5 LEMON     21 CABELL     37 WERST
  546.                                 6 BUGMAN    22 BROOK      38 LOLICH
  547.  Enter New Name/Comment         7 SHECK     23 GIBSON     39 BUNNING
  548.  WILLS                          8 WILLIS    24            40 MCLAIN
  549.                                 9 MEAD      25 KALINE     41 NORTHRUP
  550.  Enter Code number             10 KNOUS     26 WILSON     42 STANLEY
  551.  or 0 to exit ? 0              11 HOM       27 PARR       43 OYLER
  552.                                12 HEDIN     28 MORRIS     44 CASH
  553.                                13 ROBER     29 BEREN      45 WOCKFUSS
  554.                                14 MAST      30 WILCOX     46 GRUBB
  555.                                15 JONEY     31 LOPEZ      47 COBB
  556.                                16 FURRER    32 BAIR       48 GRENBERG
  557.  
  558.  Project: P&L CONSTRUCTION                          File: LLP.CPM
  559.  Time Period Units: WORKING DAYS   Sub. Codes: 48   Start Date: 070183
  560.  
  561.                                    SUBCONTRACTOR/COMMENT CODES
  562.  
  563.  Add, Change, Delete            1 WILSON    17 MACFORD    33 KRENCHIK
  564.  or Quit (A/C/D/Q) ? Q          2 JONES     18 MCCALL     34 LEACH
  565.                                 3 MILLER    19 TRAMMEL    35 FREEHAN
  566.  File Changes or Quit           4 ARCHS     20 WHITE      36 TRESH
  567.  (F/Q) F                        5 LEMON     21 CABELL     37 WERST
  568.                                 6 BUGMAN    22 BROOK      38 LOLICH
  569.                                 7 SHECK     23 GIBSON     39 BUNNING
  570.                                 8 WILLS     24            40 MCLAIN
  571.                                 9 MEAD      25 KALINE     41 NORTHRUP
  572.                                10 KNOUS     26 WILSON     42 STANLEY
  573.                                11 HOM       27 PARR       43 OYLER
  574.                                12 HEDIN     28 MORRIS     44 CASH
  575.                                13 ROBER     29 BEREN      45 WOCKFUSS
  576.                                14 MAST      30 WILCOX     46 GRUBB
  577.                                15 JONEY     31 LOPEZ      47 COBB
  578.                                16 FURRER    32 BAIR       48 GRENBERG
  579.  
  580.  
  581.  
  582.  
  583.  
  584.  
  585.  
  586.  
  587.  
  588.  
  589.  
  590.  
  591.  
  592.  
  593.  
  594.  
  595.  
  596.  
  597. è
  598.  PC PROJECT MANAGEMENT               7                     USER'S MANUAL
  599.  
  600.  
  601.  
  602.                      OPTION_3_-_ENTER/CHANGE_INPUT
  603.  
  604.                          MENU OF PCPM PROGRAMS
  605.  
  606.               EXIT PCPM SYSTEM                           -  0
  607.               INFORMATION                                -  1
  608.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  609.               ENTER/CHANGE INPUT FILE                    -  3
  610.               ENTER/CHANGE HOLIDAYS                      -  4
  611.               PERFORM CRITICAL PATH ANALYSIS             -  5
  612.               PERFORM CASH FLOW ANALYSIS                 -  6
  613.               PRODUCE BAR CHARTS                         -  7
  614.               SORT OUTPUT                                -  8
  615.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  616.               CHECK NODE NUMBERS                         - 10
  617.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  618.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  619.               GENERATE CURRENT COST REPORT               - 13
  620.               CHANGE ALL NODE NUMBERS                    - 14
  621.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  622.  
  623.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER  3
  624.  
  625.      Enter the name of the input file [.CPM] ?  LLP
  626.      10  20  30  40  **** INPUT FILE READ ****
  627.  
  628.                      INPUT_OPTION_1_-_CHANGE_TITLE
  629.  
  630.  Project: P&L CONSTRUCTION                          File: LLP.CPM
  631.  Time Period Units: WORKING DAYS   Activities: 48   Start Date: 070183
  632.  
  633.                         INPUT MODIFICATION MENU
  634.  
  635.               EXIT MODIFICATION                        - 0
  636.               CHANGE TITLE                             - 1
  637.               INPUT/ADD ACTIVITES                      - 2
  638.               DELETE ACTIVITIES                        - 3
  639.               CHANGE ACTIVITY DATA                     - 4
  640.               CHANGE TIME PERIOD UNITS                 - 5
  641.               CHANGE START DATE                        - 6
  642.               INSPECT INPUT                            - 7
  643.               CHECK NODE CONNECTIONS                   - 8
  644.               SORT AND FILE INPUT                      - 9
  645.               FILE CHANGES                             -10
  646.  
  647.      Enter number of the modification desired 1
  648.  
  649.      **** PRESENT TITLE IS P&L CONSTRUCTION
  650.      ENTER NEW TITLE ?  P&L_CONSTRUCTION_PROJECT
  651.  
  652.  
  653.  
  654.  
  655.  
  656.  
  657.  
  658.  
  659.  
  660.  
  661.  
  662.  
  663. è
  664.  PC PROJECT MANAGEMENT               8                     USER'S MANUAL
  665.  
  666.  
  667.  
  668.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  669.  Time Period Units: WORKING DAYS   Activities: 48   Start Date: 070183
  670.  
  671.                         INPUT MODIFICATION MENU
  672.  
  673.               EXIT MODIFICATION                        - 0
  674.               CHANGE TITLE                             - 1
  675.               INPUT/ADD ACTIVITIES                     - 2
  676.               DELETE ACTIVITIES                        - 3
  677.               CHANGE ACTIVITY DATA                     - 4
  678.               CHANGE TIME PERIOD UNITS                 - 5
  679.               CHANGE START DATE                        - 6
  680.               INSPECT INPUT                            - 7
  681.               CHECK NODE CONNECTIONS                   - 8
  682.               SORT AND FILE INPUT                      - 9
  683.               FILE CHANGES                             -10
  684.  
  685.          **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  686.  
  687.           /*   This message appears as a reminder to file the
  688.                 changes you've just made before exiting the
  689.                 modification menu.  It is not necessary to file
  690.                 changes after each menu option--only before
  691.                 returning to the Main Menu.
  692.  
  693.  
  694.  
  695.  
  696.  
  697.  
  698.  
  699.  
  700.  
  701.  
  702.  
  703.  
  704.  
  705.  
  706.  
  707.  
  708.  
  709.  
  710.  
  711.  
  712.  
  713.  
  714.  
  715.  
  716.  
  717.  
  718.  
  719.  
  720.  
  721.  
  722.  
  723.  
  724.  
  725.  
  726.  
  727.  
  728.  
  729. è
  730.  PC PROJECT MANAGEMENT               9                     USER'S MANUAL
  731.  
  732.  
  733.  
  734.                  INPUT_OPTION_2_-_INPUT/ADD_ACTIVITIES
  735.  
  736.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  737.  Time Period Units: WORKING DAYS   Activities: 48   Start Date: 070183
  738.  
  739.                         INPUT MODIFICATION MENU
  740.  
  741.               EXIT MODIFICATION                        - 0
  742.               CHANGE TITLE                             - 1
  743.               INPUT/ADD ACTIVITIES                     - 2
  744.               DELETE ACTIVITIES                        - 3
  745.               CHANGE ACTIVITY DATA                     - 4
  746.               CHANGE TIME PERIOD UNITS                 - 5
  747.               CHANGE START DATE                        - 6
  748.               INSPECT INPUT                            - 7
  749.               CHECK NODE CONNECTIONS                   - 8
  750.               SORT AND FILE INPUT                      - 9
  751.               FILE CHANGES                             -10
  752.  
  753.      Enter number of the modification desired   2
  754.  
  755.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  756.  Time Period Units: WORKING DAYS   Activities: 48   Start Date: 070183
  757.  
  758.  SUBCONTRACTOR/COMMENT CODES                **** ACTIVITY 49 ****
  759.  1 WILSON  17 MACFORD  33 KRENCHIK  Enter Description
  760.  2 JONES   18 MCCALL   34 LEACH     ? ADDITION
  761.  3 MILLER  19 TRAMMEL  35 FREEHAN   Enter FROM node ? 180
  762.  4 ARCHS   20 WHITE    36 TRESH     Enter TO node ? 190
  763.  5 LEMON   21 CABELL   37 WERST     Enter Estimated Time ? 4
  764.  6 BUGMAN  22 BROOK    38 LOLICH    Enter finish date (MMDDYY) ? 0
  765.  7 SHECK   23 GIBSON   39 BUNNING   Enter percent complete (###) ? 0
  766.  8 WILLS   24          40 MCLAIN    Enter Subcontractor/Comment code ? 7
  767.  9 MEAD    25 KALINE   41 NORTHRUP  Enter activity cost ($) ? 0
  768.  10 KNOUS  26 WILSON   42 STANLEY
  769.  11 HOM    27 PARR     43 OYLER     Enter more activities (Y/N) ? N
  770.  12 HEDIN  28 MORRIS   44 CASH
  771.  13 ROBER  29 BEREN    45 WOCKFUSS
  772.  14 MAST   30 WILCOX   46 GRUBB
  773.  15 JONEY  31 LOPEZ    47 COBB
  774.  16 FURRER 32 BAIR     48 GRENBERG
  775.  
  776.  
  777.  
  778.  
  779.  
  780.  
  781.  
  782.  
  783.  
  784.  
  785.  
  786.  
  787.  
  788.  
  789.  
  790.  
  791.  
  792.  
  793.  
  794.  
  795. è
  796.  PC PROJECT MANAGEMENT              10                     USER'S MANUAL
  797.  
  798.  
  799.  
  800.  
  801.                    INPUT_OPTION_3_-_DELETE_ACTIVITIES
  802.  
  803.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  804.  Time Period Units: WORKING DAYS   Activities: 49   Start Date: 070183
  805.  
  806.                         INPUT MODIFICATION MENU
  807.  
  808.               EXIT MODIFICATION                        - 0
  809.               CHANGE TITLE                             - 1
  810.               INPUT/ADD ACTIVITIES                     - 2
  811.               DELETE ACTIVITIES                        - 3
  812.               CHANGE ACTIVITY DATA                     - 4
  813.               CHANGE TIME PERIOD UNITS                 - 5
  814.               CHANGE START DATE                        - 6
  815.               INSPECT INPUT                            - 7
  816.               CHECK NODE CONNECTIONS                   - 8
  817.               SORT AND FILE INPUT                      - 9
  818.               FILE CHANGES                             -10
  819.  
  820.          **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  821.  
  822.      Enter number of the modification desired   3
  823.  
  824.          **** WHEN DELETING, START WITH THE LAST ACTIVITY FIRST
  825.               FOR BEST RESULTS ****
  826.    **** WHEN CHANGING INPUT, REFER TO THE ACTIVITY POSITION WHICH IS
  827.         DISPLAYED IN THE INPUT INSPECTION ROUTINE ****
  828.  
  829.      Inspect the activity file (Y/N/#)
  830.  
  831.      /*   Y     If a "Y" response is given, the activity
  832.                 file is displayed, beginning with Activity
  833.                 Position #1.
  834.  
  835.      /*   N     If a "N" response is given, the system asks
  836.                 "Enter number of activity to change" (input
  837.                 the Activity Position Number you wish to modify.)
  838.  
  839.      /*   #     Responding with an activity position number will
  840.                 produce the inspection file, beginning with that
  841.                 number.
  842.  
  843.      Inspect the activity file (Y/N/#)  40
  844.  
  845.  
  846.  
  847.  
  848.  
  849.  
  850.  
  851.  
  852.  
  853.  
  854.  
  855.  
  856.  
  857.  
  858.  
  859.  
  860.  
  861. è
  862.  PC PROJECT MANAGEMENT              11                     USER'S MANUAL
  863.  
  864.  
  865.  
  866.  ACT               FROM  TO  ACT  EST   REPORT  % SUB NAME ACT
  867.  POS  _DESCRIPTION NODE NODE TIME TIME  FINISH DUN COMMENT COST
  868.  
  869.  40   CURBS & SID   650  960    5    5       0   0 MCCLAIN   $0
  870.  41   FINAL CLEAN   960  970    2    2       0   0 NORTHRUP  $0
  871.  42   DUMMY         600  620    0    0       0   0 STANLEY   $0
  872.  43   ROOF HATCH    890  950    1    1       0   0 OYLER     $0
  873.  44   DUMMY         587  590   10   10       0   0 CASH      $0
  874.  45   METAL DECK    587  597   25   25       0   0 WOCKFUSS  $0
  875.  46   DUMMY         810  955    0    0       0   0 GRUBB     $0
  876.  47   DUMMY         595  597    5    5       0   0 COBB      $0
  877.  48   TOILET ACC    940  960    2    2       0   0 GRENBERG  $0
  878.  49   ADDITION      180  190    4    4       0   0 SHECK     $0
  879.  
  880.      Press ENTER to continue <CR>
  881.  
  882.  Enter position number of the activity to delete - 0 to exit ? 49
  883.  Enter position number of the activity to delete - 0 to exit ? 0
  884.  
  885.  
  886.  
  887.  
  888.  
  889.  
  890.  
  891.  
  892.  
  893.  
  894.  
  895.  
  896.  
  897.  
  898.  
  899.  
  900.  
  901.  
  902.  
  903.  
  904.  
  905.  
  906.  
  907.  
  908.  
  909.  
  910.  
  911.  
  912.  
  913.  
  914.  
  915.  
  916.  
  917.  
  918.  
  919.  
  920.  
  921.  
  922.  
  923.  
  924.  
  925.  
  926.  
  927. è
  928.  PC PROJECT MANAGEMENT              12                     USER'S MANUAL
  929.  
  930.  
  931.  
  932.                  INPUT_OPTION_4_-_CHANGE_ACTIVITY_DATA
  933.  
  934.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  935.  Time Period Units: WORKING DAYS   Activities: 48   Start Date: 070183
  936.  
  937.                         INPUT MODIFICATION MENU
  938.  
  939.               EXIT MODIFICATION                        - 0
  940.               CHANGE TITLE                             - 1
  941.               INPUT/ADD ACTIVITIES                     - 2
  942.               DELETE ACTIVITIES                        - 3
  943.               CHANGE ACTIVITY DATA                     - 4
  944.               CHANGE TIME PERIOD UNITS                 - 5
  945.               CHANGE START DATE                        - 6
  946.               INSPECT INPUT                            - 7
  947.               CHECK NODE CONNECTIONS                   - 8
  948.               FILE CHANGES                             - 9
  949.  
  950.          **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  951.  
  952.      Enter number of the modification desired  _4_
  953.  
  954.      Inspect the activity file (Y/N/#)  20
  955.  
  956.  ACT               FROM  TO  ACT  EST   REPORT  % SUB NAME ACT
  957.  POS  _DESCRIPTION NODE NODE TIME TIME  FINISH DUN COMMENT COST
  958.  
  959.  20   POUR S.O.G.   630  790    8    8       0   0 WHITE     $0
  960.  21   STAIRCASES    585  590   25   25       0   0 CABELL    $0
  961.  22   PLUB. TOP O   630  890   10   10       0   0 BROOK     $0
  962.  23   ELEC. PULL    640  760   10   10       0   0 GIBSON    $0
  963.  24   ELEC. FIXTU   760  960    5    5       0   0 GENERAL   $0
  964.  25   STAIR FILL    597  710   10   10       0   0 KALINE    $0
  965.  26   INSULATION    790  800    2    2       0   0 WILSON    $0
  966.  27   DRYWALL       800  810   10   10       0   0 PARR      $0
  967.  28   CERAMIC TIL   810  850   20   20       0   0 MORRIS    $0
  968.  29   PAINT INTER   810  860   10   10       0   0 BEREN     $0
  969.  30   DUMMY         860  870    0    0       0   0 WILCOX    $0
  970.  31   STAIN DOORS   870  920    5    5       0   0 LOPEZ     $0
  971.  32   FINISH HARD   920  960    5    5       0   0 BAIR      $0
  972.  33   METAL SIDIN   650  890    2    2       0   0 KRENCHIK  $0
  973.  34   ACCESS LADD   950  960    1    1       0   0 LEACH     $0
  974.  35   REGISTERS &   955  957    5    5       0   0 FREEHAN   $0
  975.  36   BALANCE H.V   957  960    2    2       0   0 TRESH     $0
  976.  37   TOILET FIXT   850  910    5    5       0   0 WERST     $0
  977.  
  978.      Press ENTER to continue, or Q to quit <CR>
  979.  
  980.  
  981.  
  982.  
  983.  
  984.  
  985.  
  986.  
  987.  
  988.  
  989.  
  990.  
  991.  
  992.  
  993. è
  994.  PC PROJECT MANAGEMENT              13                     USER'S MANUAL
  995.  
  996.  
  997.  
  998.  
  999.  ACT               FROM  TO  ACT  EST   REPORT  % SUB NAME ACT
  1000.  POS  _DESCRIPTION NODE NODE TIME TIME  FINISH DUN COMMENT COST
  1001.  
  1002.  38   TOILET PART   910  940    2    2       0   0 LOLICH    $0
  1003.  39   PAINT STAIR   710  960    3    3       0   0 BUNNING   $0
  1004.  40   CURBS & SID   650  960    5    5       0   0 MCCLAIN   $0
  1005.  41   FINAL CLEAN   960  970    2    2       0   0 NORTHRUP  $0
  1006.  42   DUMMY         600  620    0    0       0   0 STANLEY   $0
  1007.  43   ROOF HATCH    890  950    1    1       0   0 OYLER     $0
  1008.  44   DUMMY         587  590   10   10       0   0 CASH      $0
  1009.  45   METAL DECK    587  597   25   25       0   0 WOCKFUSS  $0
  1010.  46   DUMMY         810  955    0    0       0   0 GRUBB     $0
  1011.  47   DUMMY         595  597    5    5       0   0 COBB      $0
  1012.  48   TOILET ACC    940  960    2    2       0   0 GRENBERG  $0
  1013.  
  1014.      Press ENTER to continue <CR>
  1015.  
  1016.     Enter pointer to activity to change    27
  1017.  
  1018.     DRYWALL                       800 810 10 10 0 0 PARR   0
  1019.  
  1020.     Change DESC,FROM NODE,TO NODE,TIME,FINDAT,%,SUB CODE,COST,QUIT
  1021.     Enter (  D ,   FN    ,  TN   ,  T ,  F   ,%,    S   , C , or Q) TN
  1022.     Enter the new TO node _870_
  1023.                           _____
  1024.  
  1025.     DRYWALL                       810 870 10 10 0 0 PARR    0
  1026.  
  1027.     Change DESC,FROM NODE,TO NODE,TIME,FINDAT,%,SUB CODE,COST,QUIT
  1028.     Enter (  D ,   FN    ,  TN   ,  T ,  F   ,%,    S   , C , or Q) S
  1029.     Enter subcode number ? 10
  1030.  
  1031.     DRYWALL                       810 870 10 10 0 0 KNOUS   0
  1032.     Change More Activities (Y/N/#) N
  1033.  
  1034.  
  1035.  
  1036.  
  1037.  
  1038.  
  1039.  
  1040.  
  1041.  
  1042.  
  1043.  
  1044.  
  1045.  
  1046.  
  1047.  
  1048.  
  1049.  
  1050.  
  1051.  
  1052.  
  1053.  
  1054.  
  1055.  
  1056.  
  1057.  
  1058.  
  1059. è
  1060.  PC PROJECT MANAGEMENT              14                     USER'S MANUAL
  1061.  
  1062.  
  1063.  
  1064.                INPUT_OPTION_5_-_CHANGE_TIME_PERIOD_UNITS
  1065.  
  1066.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1067.  Time Period Units: WORKING DAYS   Activities: 48   Start Date: 070183
  1068.  
  1069.                         INPUT MODIFICATION MENU
  1070.  
  1071.               EXIT MODIFICATION                        - 0
  1072.               CHANGE TITLE                             - 1
  1073.               INPUT/ADD ACTIVITIES                     - 2
  1074.               DELETE ACTIVITIES                        - 3
  1075.               CHANGE ACTIVITY DATA                     - 4
  1076.               CHANGE TIME PERIOD UNITS                 - 5
  1077.               CHANGE START DATE                        - 6
  1078.               INSPECT INPUT                            - 7
  1079.               CHECK NODE CONNECTIONS                   - 8
  1080.               SORT AND FILE INPUT                      - 9
  1081.               FILE CHANGES                             -10
  1082.  
  1083.          **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  1084.  
  1085.      Enter number of the modification desired  _5_
  1086.      **** PRESENT TIME UNITS ARE  WORKING DAYS ****
  1087.      Enter new time units  CALENDAR_DAYS
  1088.      **** PCPM WILL OMIT HOLIDAYS BUT NOT WEEKENDS ****
  1089.  
  1090.  
  1091.  
  1092.  
  1093.  
  1094.  
  1095.  
  1096.  
  1097.  
  1098.  
  1099.  
  1100.  
  1101.  
  1102.  
  1103.  
  1104.  
  1105.  
  1106.  
  1107.  
  1108.  
  1109.  
  1110.  
  1111.  
  1112.  
  1113.  
  1114.  
  1115.  
  1116.  
  1117.  
  1118.  
  1119.  
  1120.  
  1121.  
  1122.  
  1123.  
  1124.  
  1125. è
  1126.  PC PROJECT MANAGEMENT              15                     USER'S MANUAL
  1127.  
  1128.  
  1129.  
  1130.                    INPUT_OPTION_6_-_CHANGE_START_DATE
  1131.  
  1132.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1133.  Time Period Units: CALENDAR DAYS  Activities: 48   Start Date: 070183
  1134.  
  1135.                         INPUT MODIFICATION MENU
  1136.  
  1137.               EXIT MODIFICATION                        - 0
  1138.               CHANGE TITLE                             - 1
  1139.               INPUT ADD ACTIVITIES                     - 2
  1140.               DELETE ACTIVITIES                        - 3
  1141.               CHANGE ACTIVITY DATA                     - 4
  1142.               CHANGE TIME PERIOD UNITS                 - 5
  1143.               CHANGE START DATE                        - 6
  1144.               INSPECT INPUT                            - 7
  1145.               CHECK NODE CONNECTIONS                   - 8
  1146.               SORT AND FILE INPUT                      - 9
  1147.               FILE CHANGES                             -10
  1148.  
  1149.          **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  1150.  
  1151.      Enter number of the modification desired  _6_
  1152.      **** PRESENT START DATE IS 070183 ****
  1153.      Enter new start date in MMDDYY format ? 10483
  1154.  
  1155.        /*10483 would be January 4, 1983
  1156.  
  1157.  
  1158.  
  1159.  
  1160.  
  1161.  
  1162.  
  1163.  
  1164.  
  1165.  
  1166.  
  1167.  
  1168.  
  1169.  
  1170.  
  1171.  
  1172.  
  1173.  
  1174.  
  1175.  
  1176.  
  1177.  
  1178.  
  1179.  
  1180.  
  1181.  
  1182.  
  1183.  
  1184.  
  1185.  
  1186.  
  1187.  
  1188.  
  1189.  
  1190.  
  1191. è
  1192.  PC PROJECT MANAGEMENT              16                     USER'S MANUAL
  1193.  
  1194.  
  1195.  
  1196.                      INPUT_OPTION_7_-_INSPECT_INPUT
  1197.  
  1198.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1199.  Time Period Units: CALENDAR DAYS  Activities: 48   Start Date: 10483
  1200.  
  1201.                         INPUT MODIFICATION MENU
  1202.  
  1203.               EXIT MODIFICATION                        - 0
  1204.               CHANGE TITLE                             - 1
  1205.               INPUT/ADD ACTIVITIES                     - 2
  1206.               DELETE ACTIVITIES                        - 3
  1207.               CHANGE ACTIVITY DATA                     - 4
  1208.               CHANGE TIME PERIOD UNITS                 - 5
  1209.               CHANGE START DATE                        - 6
  1210.               INSPECT INPUT                            - 7
  1211.               CHECK NODE CONNECTIONS                   - 8
  1212.               SORT AND FILE INPUT                      - 9
  1213.               FILE CHANGES                             -10
  1214.  
  1215.      Enter number of the modification desired 7
  1216.  
  1217.              PROJECT TITLE : P&L CONSTRUCTION PROJECT
  1218.              TIME UNITS    : CALENDAR
  1219.              START DATE    : 010483
  1220.  
  1221.      Press ENTER to continue, or Q to quit <CR>
  1222.  
  1223.  ACT               FROM  TO  ACT  EST   REPORT  % SUB NAME ACT
  1224.  POS  _DESCRIPTION NODE NODE TIME TIME  FINISH DUN COMMENT COST
  1225.  
  1226.   1   MOBILIZATION  500  510    2    2       0   0 WILSON    $0
  1227.   2   GRADE & CLEA  510  520    5    5       0   0 JONES     $0
  1228.   3   REBAR PIERS   520  530    5    5       0   0 MILLER    $0
  1229.   4   POUR PIERS    530  550    5    5       0   0 ARCHS     $0
  1230.   5   EXCAVATE FO   550  560    8    8       0   0 LEMON     $0
  1231.   6   REBAR FOUND   560  570    5    5       0   0 BUGMAN    $0
  1232.   7   ANCHOR BOLT   570  580    2    2       0   0 SHECK     $0
  1233.   8   POUR & CURE   580  585    5    5       0   0 WILLIS    $0
  1234.   9   STRUCTURAL    585  587   10   10       0   0 MEAD      $0
  1235.  10   DECK FILL C   590  600   15   15       0   0 KNOUS     $0
  1236.  11   WELD STRUCT   587  595   20   20       0   0 HOM       $0
  1237.  12   FIRE PROOFI   620  625    5    5       0   0 HEDIN     $0
  1238.  13   PRECAST PAN   625  650   20   20       0   0 ROBER     $0
  1239.  14   P.M. FRAMES   600  790    2    2       0   0 MAST      $0
  1240.  15   WALL FRAMIN   600  790   20   20       0   0 JONEY     $0
  1241.  16   SHEET METAL   600  955   40   40       0   0 FURRER    $0
  1242.  17   ELEC. RGH.    620  640   10   10       0   0 MACFORD   $0
  1243.  18   MAIN ELEC     640  790   10   10       0   0 MCCALL    $0
  1244.  19   PLUMBING RG   620  630    5    5       0   0 TRAMMEL   $0
  1245.  
  1246.      Press ENTER to continue, or Q to quit  <CR>
  1247.  
  1248.  
  1249.  
  1250.  
  1251.  
  1252.  
  1253.  
  1254.  
  1255.  
  1256.  
  1257. è
  1258.  PC PROJECT MANAGEMENT              17                     USER'S MANUAL
  1259.  
  1260.  
  1261.  
  1262.  ACT               FROM  TO  ACT  EST   REPORT  % SUB NAME ACT
  1263.  POS  _DESCRIPTION NODE NODE TIME TIME  FINISH DUN COMMENT COST
  1264.  
  1265.  20   POUR S.O.G.   630  790    8    8       0   0 WHITE     $0
  1266.  21   STAIRCASES    585  590   25   25       0   0 CABELL    $0
  1267.  22   PLUB. TOP O   630  890   10   10       0   0 BROOK     $0
  1268.  23   ELEC. PULL    640  760   10   10       0   0 GIBSON    $0
  1269.  24   ELEC. FIXTU   760  960    5    5       0   0 GENERAL   $0
  1270.  25   STAIR FILL    597  710   10   10       0   0 KALINE    $0
  1271.  26   INSULATION    790  800    2    2       0   0 WILSON    $0
  1272.  27   DRYWALL       800  870   10   10       0   0 KNOUS     $0
  1273.  28   CERAMIC TIL   810  850   20   20       0   0 MORRIS    $0
  1274.  29   PAINT INTER   810  860   10   10       0   0 BEREN     $0
  1275.  30   DUMMY         860  870    0    0       0   0 WILCOX    $0
  1276.  31   STAIN DOORS   870  920    5    5       0   0 LOPEZ     $0
  1277.  32   FINISH HARD   920  960    5    5       0   0 BAIR      $0
  1278.  33   METAL SIDIN   650  890    2    2       0   0 KRENCHIK  $0
  1279.  34   ACCESS LADD   950  960    1    1       0   0 LEACH     $0
  1280.  35   REGISTERS &   955  957    5    5       0   0 FREEHAN   $0
  1281.  36   BALANCE H.V   957  960    2    2       0   0 TRESH     $0
  1282.  37   TOILET FIXT   850  910    5    5       0   0 WERST     $0
  1283.  
  1284.      Press ENTER to continue, or Q to quit <CR>
  1285.  
  1286.  ACT               FROM  TO  ACT  EST   REPORT  % SUB NAME ACT
  1287.  POS  _DESCRIPTION NODE NODE TIME TIME  FINISH DUN COMMENT COST
  1288.  
  1289.  38   TOILET PART   910  940    2    2       0   0 LOLICH    $0
  1290.  39   PAINT STAIR   710  960    3    3       0   0 BUNNING   $0
  1291.  40   CURBS & SID   650  960    5    5       0   0 MCCLAIN   $0
  1292.  41   FINAL CLEAN   960  970    2    2       0   0 NORTHRUP  $0
  1293.  42   DUMMY         600  620    0    0       0   0 STANLEY   $0
  1294.  43   ROOF HATCH    890  950    1    1       0   0 OYLER     $0
  1295.  44   DUMMY         587  590   10   10       0   0 CASH      $0
  1296.  45   METAL DECK    587  597   25   25       0   0 WOCKFUSS  $0
  1297.  46   DUMMY         810  955    0    0       0   0 GRUBB     $0
  1298.  47   DUMMY         595  597    5    5       0   0 COBB      $0
  1299.  48   TOILET ACC    940  960    2    2       0   0 GRENBERG  $0
  1300.  
  1301.      Press ENTER to continue <CR>
  1302.  
  1303.  
  1304.  
  1305.  
  1306.  
  1307.  
  1308.  
  1309.  
  1310.  
  1311.  
  1312.  
  1313.  
  1314.  
  1315.  
  1316.  
  1317.  
  1318.  
  1319.  
  1320.  
  1321.  
  1322.  
  1323. è
  1324.  PC PROJECT MANAGEMENT              18                     USER'S MANUAL
  1325.  
  1326.  
  1327.  
  1328.                 INPUT_OPTION_8_-_CHECK_NODE_CONNECTIONS
  1329.  
  1330.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1331.  Time Period Units: CALENDAR DAYS  Activities: 48   Start Date: 10483
  1332.  
  1333.                         INPUT MODIFICATION MENU
  1334.  
  1335.               EXIT MODIFICATION                        - 0
  1336.               CHANGE TITLE                             - 1
  1337.               INPUT/ADD ACTIVITIES                     - 2
  1338.               DELETE ACTIVITIES                        - 3
  1339.               CHANGE ACTIVITY DATA                     - 4
  1340.               CHANGE TIME PERIOD UNITS                 - 5
  1341.               CHANGE START DATE                        - 6
  1342.               INSPECT INPUT                            - 7
  1343.               CHECK NODE CONNECTIONS                   - 8
  1344.               SORT AND FILE INPUT                      - 9
  1345.               FILE CHANGES                             -10
  1346.  
  1347.      **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  1348.  
  1349.      Enter number of the modification desired  _8_
  1350.      **** QUIET - COMPUTER THINKING - CHECKING NODES ****
  1351.      **** START NODES O.K. ****
  1352.      **** END NODES O.K. ****
  1353.  
  1354.      Press ENTER to continue <CR>
  1355.  
  1356.      /*   Checking node connections can also be accomplished
  1357.           using Option 5 of the Main Menu, "PERFORM CRITICAL PATH
  1358.           ANALYSIS".
  1359.  
  1360.  
  1361.  
  1362.  
  1363.  
  1364.  
  1365.  
  1366.  
  1367.  
  1368.  
  1369.  
  1370.  
  1371.  
  1372.  
  1373.  
  1374.  
  1375.  
  1376.  
  1377.  
  1378.  
  1379.  
  1380.  
  1381.  
  1382.  
  1383.  
  1384.  
  1385.  
  1386.  
  1387.  
  1388.  
  1389. è
  1390.  PC PROJECT MANAGEMENT              19                     USER'S MANUAL
  1391.  
  1392.  
  1393.  
  1394.                   INPUT_OPTION_9_-_SORT_AND_FILE_INPUT
  1395.  
  1396.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1397.  Time Period Units: CALENDAR DAYS  Activities: 48   Start Date: 10483
  1398.  
  1399.                         INPUT MODIFICATION MENU
  1400.  
  1401.               EXIT MODIFICATION                        - 0
  1402.               CHANGE TITLE                             - 1
  1403.               INPUT/ADD ACTIVITES                      - 2
  1404.               DELETE ACTIVITIES                        - 3
  1405.               CHANGE ACTIVITY DATA                     - 4
  1406.               CHANGE TIME PERIOD UNITS                 - 5
  1407.               CHANGE START DATE                        - 6
  1408.               INSPECT INPUT                            - 7
  1409.               CHECK NODE CONNECTIONS                   - 8
  1410.               SORT AND FILE INPUT                      - 9
  1411.               FILE CHANGES                             -10
  1412.  
  1413.      **** BE SURE TO FILE ANY CHANGES IN YOU WANT THEM ****
  1414.  
  1415.      Enter number of the modification desired 9
  1416.  
  1417.      **** SORTING 48 ACTIVITIES ******** SORT COMPLETE ****
  1418.      **** WRITING FILE TO DISK ****
  1419.      **** FILE LLP.CPM UPDATED ****
  1420.      **** READING SORTED FILE ****
  1421.      10  20  30  40  **** INPUT FILE READ ****
  1422.  
  1423.      Press ENTER to continue <CR>
  1424.  
  1425.  
  1426.  
  1427.  
  1428.  
  1429.  
  1430.  
  1431.  
  1432.  
  1433.  
  1434.  
  1435.  
  1436.  
  1437.  
  1438.  
  1439.  
  1440.  
  1441.  
  1442.  
  1443.  
  1444.  
  1445.  
  1446.  
  1447.  
  1448.  
  1449.  
  1450.  
  1451.  
  1452.  
  1453.  
  1454.  
  1455. è
  1456.  PC PROJECT MANAGEMENT              20                     USER'S MANUAL
  1457.  
  1458.  
  1459.                    INPUT_OPTION_0_-_EXIT_MODIFICATION
  1460.  
  1461.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1462.  Time Period Units: CALENDAR DAYS  Activities: 48   Start Date: 10483
  1463.  
  1464.                         INPUT MODIFICATION MENU
  1465.  
  1466.               EXIT MODIFICATION                        - 0
  1467.               CHANGE TITLE                             - 1
  1468.               INPUT/ADD ACTIVITIES                     - 2
  1469.               DELETE ACTIVITIES                        - 3
  1470.               CHANGE ACTIVITY DATA                     - 4
  1471.               CHANGE TIME PERIOD UNITS                 - 5
  1472.               CHANGE START DATE                        - 6
  1473.               INSPECT INPUT                            - 7
  1474.               CHECK NODE CONNECTIONS                   - 8
  1475.               SORT AND FILE INPUT                      - 9
  1476.               FILE CHANGES                             -10
  1477.  
  1478.      **** BE SURE TO FILE ANY CHANGES IF YOU WANT THEM ****
  1479.  
  1480.      Enter number of the modification desired  _0_
  1481.      Last changes were not filed - Are you sure (Y/N) ?  _N_
  1482.  
  1483.        /*   Before exiting the Modification Menu and returning
  1484.             to the Main Menu, any changes made must be filed.
  1485.             If it is desired, the changes can be stored under a
  1486.             separate file name.
  1487.  
  1488.                      INPUT_OPTION_10_-_FILE_CHANGES
  1489.  
  1490.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1491.  Time Period Units: CALENDAR Fa2S  Activities: 48   Start Date: 10483
  1492.  
  1493.                         INPUT MODIFICATION MENU
  1494.  
  1495.               EXIT MODIFICATION                        - 0
  1496.               CHANGE TITLE                             - 1
  1497.               INPUT/ADD ACTIVITES                      - 2
  1498.               DELETE ACTIVITIES                        - 3
  1499.               CHANGE ACTIVITY DATA                     - 4
  1500.               CHANGE TIME PERIOD UNITS                 - 5
  1501.               CHANGE START DATE                        - 6
  1502.               INSPECT INPUT                            - 7
  1503.               CHECK NODE CONNECTIONS                   - 8
  1504.               SORT AND FILE INPUT                      - 9
  1505.               FILE CHANGES                             -10
  1506.  
  1507.      Enter number of the modification desired  10
  1508.  
  1509.      Use LLP.CPM as filename (Y/N)  ?  _Y_
  1510.      **** FILE LLP.CPM UPDATED ****
  1511.  
  1512.        /*   If "N", System asks "Enter new filename".
  1513.  
  1514.  
  1515.  
  1516.  
  1517.  
  1518.  
  1519.  
  1520.  
  1521. è
  1522.  PC PROJECT MANAGEMENT              21                     USER'S MANUAL
  1523.  
  1524.  
  1525.  
  1526.  
  1527.  Project: P&L CONSTRUCTION PROJECT                  File: LLP.CPM
  1528.  Time Period Units: CALENDAR DAYS  Activities: 48   Start Date: 10483
  1529.  
  1530.                         INPUT MODIFICATION MENU
  1531.  
  1532.               EXIT MODIFICATION                        - 0
  1533.               CHANGE TITLE                             - 1
  1534.               INPUT/ADD ACTIVITIES                     - 2
  1535.               DELETE ACTIVITIES                        - 3
  1536.               CHANGE ACTIVITY DATA                     - 4
  1537.               CHANGE TIME PERIOD UNITS                 - 5
  1538.               CHANGE START DATE                        - 6
  1539.               INSPECT INPUT                            - 7
  1540.               CHECK NODE CONNECTIONS                   - 8
  1541.               SORT AND FILE INPUT                      - 9
  1542.               FILE CHANGES                             -10
  1543.  
  1544.      Enter number of the modification desired  _0_
  1545.  
  1546.        /*   System returns to Main Menu.
  1547.  
  1548.  
  1549.  
  1550.  
  1551.  
  1552.  
  1553.  
  1554.  
  1555.  
  1556.  
  1557.  
  1558.  
  1559.  
  1560.  
  1561.  
  1562.  
  1563.  
  1564.  
  1565.  
  1566.  
  1567.  
  1568.  
  1569.  
  1570.  
  1571.  
  1572.  
  1573.  
  1574.  
  1575.  
  1576.  
  1577.  
  1578.  
  1579.  
  1580.  
  1581.  
  1582.  
  1583.  
  1584.  
  1585.  
  1586.  
  1587. è
  1588.  PC PROJECT MANAGEMENT              22                     USER'S MANUAL
  1589.  
  1590.  
  1591.  
  1592.                    OPTION_4_-_CREATE/CHANGE_HOLIDAYS
  1593.  
  1594.                          MENU OF PCPM PROGRAMS
  1595.  
  1596.               EXIT PCPM SYSTEM                           -  0
  1597.               INFORMATION                                -  1
  1598.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  1599.               ENTER/CHANGE INPUT FILE                    -  3
  1600.               ENTER/CHANGE HOLIDAYS                      -  4
  1601.               PERFORM CRITICAL PATH ANALYSIS             -  5
  1602.               PERFORM CASH FLOW ANALYSIS                 -  6
  1603.               PRODUCE BAR CHARTS                         -  7
  1604.               SORT OUTPUT                                -  8
  1605.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  1606.               CHECK NODE NUMBERS                         - 10
  1607.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  1608.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  1609.               GENERATE CURRENT COST REPORT               - 13
  1610.               CHANGE ALL NODE NUMBERS                    - 14
  1611.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  1612.  
  1613.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER  _4_
  1614.  
  1615.  
  1616.      **** THIS MODULE CREATES AND MANAGES HOLIDAY [.HOL] FILES ****
  1617.  
  1618.      Enter the name of the base data file ?   LLP
  1619.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 2,21,83
  1620.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 5,30,83
  1621.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 7,3,83
  1622.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 9,5,83
  1623.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 11,11,83
  1624.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 11,24,83
  1625.      Enter holidays in MM,DD,YY format (0,0,0 if end) ? 0,0,0
  1626.  
  1627.      **** LIST OF HOLIDAYS FOR THE BASE DATA FILE LLP ****
  1628.  
  1629.     1  February 21 1983
  1630.     2  May 30 1983
  1631.     3  July 3 1983
  1632.     4  September 5 1983
  1633.     5  November 11 1983
  1634.     6  November 24 1983
  1635.  
  1636.       /*  The holiday file can also be used to store any
  1637.           date on which no work was done--such as rain
  1638.           days, or strikes.  Just enter the days as if
  1639.           they were holidays.
  1640.  
  1641.     Do you want to change, add, delete or quit (C/A/D/Q)  _C_
  1642.  
  1643.      Enter number of holiday to change  _3_
  1644.      Enter new date in MM,DD,YY format  _7,4,83_
  1645.  
  1646.  
  1647.  
  1648.  
  1649.  
  1650.  
  1651.  
  1652.  
  1653. è
  1654.  PC PROJECT MANAGEMENT              23                     USER'S MANUAL
  1655.  
  1656.  
  1657.  
  1658.     **** LIST OF HOLIDAYS FOR THE BASE DATA FILE LLP ****
  1659.  
  1660.      1 February 21 1983
  1661.      2 May 30 1983
  1662.      3 July 4 1983
  1663.      4 September 5 1983
  1664.      5 November 11 1983
  1665.      6 November 24 1983
  1666.  
  1667.      Do you want to change, add, delete or quit (C/A/D/Q)  _D_
  1668.  
  1669.      ENTER NUMBER OF HOLIDAY TO DELETE  6
  1670.  
  1671.     **** LIST OF HOLIDAYS FOR THE BASE DATA FILE LLP ****
  1672.  
  1673.      1 February 21 1983
  1674.      2 May 30 1983
  1675.      3 July 4 1983
  1676.      4 September 5 1983
  1677.      5 November 11 1983
  1678.  
  1679.      Do you want to change, add, delete or quit (C/A/D/Q) _Q_
  1680.      File changes or Quit (F/Q) ? F
  1681.      **** FILENAME IS LLP.HOL ****
  1682.  
  1683.      /*  The file is stored under BASEFILE.HOL and the system returns
  1684.          to Main Menu.
  1685.  
  1686.  
  1687.  
  1688.  
  1689.  
  1690.  
  1691.  
  1692.  
  1693.  
  1694.  
  1695.  
  1696.  
  1697.  
  1698.  
  1699.  
  1700.  
  1701.  
  1702.  
  1703.  
  1704.  
  1705.  
  1706.  
  1707.  
  1708.  
  1709.  
  1710.  
  1711.  
  1712.  
  1713.  
  1714.  
  1715.  
  1716.  
  1717.  
  1718.  
  1719. è
  1720.  PC PROJECT MANAGEMENT              24                     USER'S MANUAL
  1721.  
  1722.  
  1723.  
  1724.                OPTION_5_-_PERFORM_CRITICAL_PATH_ANALYSIS
  1725.  
  1726.                          MENU OF PCPM PROGRAMS
  1727.  
  1728.               EXIT PCPM SYSTEM                           -  0
  1729.               INFORMATION                                -  1
  1730.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  1731.               ENTER/CHANGE INPUT FILE                    -  3
  1732.               ENTER/CHANGE HOLIDAYS                      -  4
  1733.               PERFORM CRITICAL PATH ANALYSIS             -  5
  1734.               PERFORM CASH FLOW ANALYSIS                 -  6
  1735.               PRODUCE BAR CHARTS                         -  7
  1736.               SORT OUTPUT                                -  8
  1737.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  1738.               CHECK NODE NUMBERS                         - 10
  1739.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  1740.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  1741.               GENERATE CURRENT COST REPORT               - 13
  1742.               CHANGE ALL NODE NUMBERS                    - 14
  1743.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  1744.  
  1745.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER  _5_
  1746.  
  1747.      Enter the name of the input file [.CPM] ?  _LLP_
  1748.      10  20  30  40  **** INPUT FILE READ ****
  1749.      **** BYPASSING SORT ROUTINE ****
  1750.      The Output Filename is LLP.OUT O.K. (Y/N) ? Y
  1751.      Want to adjust for reported finish times (Y/N) ? Y
  1752.  
  1753.        /* A "N" ignores the report finish dates entirely.
  1754.  
  1755.     **** PROJECT LENGTH IS 140 WORKING DAYS ****
  1756.     **** THIS WILL TAKE 140 SECONDS IN REGULAR BASIC ****
  1757.     **** END DATE IS MAY2483 ****
  1758.     **** READING SUB CONTRACTORS ****
  1759.     **** OUTPUTTING ANALYSIS AND SORT FILE ****
  1760.  
  1761.     Want to create an updated schedule (Y/N) _Y_
  1762.     **** CAUTION: YOU MUST CONSOLIDATE UPDATE FILES BEFORE CALLING
  1763.          NEW OPTIONS ****
  1764.     **** FINISHED CPM - WRITING CRITICAL PATH LIST TO FILE ****
  1765.  
  1766.         /*  An update file called LLP.UPD has been created.
  1767.  
  1768.         /*  The Critical Path Analysis is complete.  System now
  1769.             returns to Main Menu.
  1770.  
  1771.  
  1772.  
  1773.  
  1774.  
  1775.  
  1776.  
  1777.  
  1778.  
  1779.  
  1780.  
  1781.  
  1782.  
  1783.  
  1784.  
  1785. è
  1786.  PC PROJECT MANAGEMENT              25                     USER'S MANUAL
  1787.  
  1788.  
  1789.  
  1790.  
  1791.                  OPTION_6_-_PERFORM_CASH_FLOW_ANALYSIS
  1792.  
  1793.                          MENU OF PCPM PROGRAMS
  1794.  
  1795.               EXIT PCPM SYSTEM                           -  0
  1796.               INFORMATION                                -  1
  1797.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  1798.               ENTER/CHANGE INPUT FILE                    -  3
  1799.               ENTER/CHANGE HOLIDAYS                      -  4
  1800.               PERFORM CRITICAL PATH ANALYSIS             -  5
  1801.               PERFORM CASH FLOW ANALYSIS                 -  6
  1802.               PRODUCE BAR CHARTS                         -  7
  1803.               SORT OUTPUT                                -  8
  1804.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  1805.               CHECK NODE NUMBERS                         - 10
  1806.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  1807.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  1808.               GENERATE CURRENT COST REPORT               - 13
  1809.               CHANGE ALL NODE NUMBERS                    - 14
  1810.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  1811.  
  1812.     CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER  _6_
  1813.  
  1814.          /*  CFA calculates the monthly cash outlays for each activity
  1815.          throughout the project based on the schedule as calculated by
  1816.          Option 5.  Costs can be calculated based on early or late start
  1817.          dates.  Activities which have not yet incurred costs can be
  1818.          excluded.
  1819.  
  1820.     Enter the name of the input file [.CPM] ? _LLP_
  1821.     10  20  30  40 **** INPUT FILE READ ****
  1822.  
  1823.     Want Early or Late Projection (E/L) ?  _E_
  1824.     10  20  30  40 **** LGS FILE READ ****
  1825.     **** NOW FIGURING DAYS - WILL TAKE 35 SECONDS IN REGULAR BASIC ****
  1826.     **** DAYS FIGURED - DISTRIBUTING COSTS AMONG MONTHS ****
  1827.     Name of output file is LLP.CFA O.K. (Y/N) ? Y
  1828.     Want to suppress zero-cost activities  (Y/N)  ?_Y_
  1829.     **** THINKING  FINISHING ****
  1830.     **** LLP.CFA CREATED ****
  1831.  
  1832.        /*  When the calculation is complete, the system returns to
  1833.            Menu.  The sample Cash Flow Analysis, contained in output
  1834.            file LLP.CFA, is shown in the appendix.
  1835.  
  1836.  
  1837.  
  1838.  
  1839.  
  1840.  
  1841.  
  1842.  
  1843.  
  1844.  
  1845.  
  1846.  
  1847.  
  1848.  
  1849.  
  1850.  
  1851. è
  1852.  PC PROJECT MANAGEMENT              26                     USER'S MANUAL
  1853.  
  1854.  
  1855.  
  1856.  
  1857.                      OPTION_7_-_PRODUCE_BAR_CHARTS
  1858.  
  1859.                          MENU OF PCPM PROGRAMS
  1860.  
  1861.               EXIT PCPM SYSTEM                           -  0
  1862.               INFORMATION                                -  1
  1863.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  1864.               ENTER/CHANGE INPUT FILE                    -  3
  1865.               ENTER/CHANGE HOLIDAYS                      -  4
  1866.               PERFORM CRITICAL PATH ANALYSIS             -  5
  1867.               PERFORM CASH FLOW ANALYSIS                 -  6
  1868.               PRODUCE BAR CHARTS                         -  7
  1869.               SORT OUTPUT                                -  8
  1870.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  1871.               CHECK NODE NUMBERS                         - 10
  1872.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  1873.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  1874.               GENERATE CURRENT COST REPORT               - 13
  1875.               CHANGE ALL NODE NUMBERS                    - 14
  1876.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  1877.  
  1878.     CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER 7
  1879.  
  1880.     Enter the name of the input file [.CPM] ? LLP
  1881.  
  1882.     **** INPUT FILE READ ****
  1883.     10  20  30  40  **** LGS FILE READ ****
  1884.     **** CALCULATING DAYS ****
  1885.     Output File will be LLP.BAR O.K. (Y/N) ? Y
  1886.     Enter width for the chart.  Enter defaults to 90 : <CR>
  1887.  
  1888.            /*  The width for the barchart depends on the printer
  1889.                used and the number of days in the schedule.  The
  1890.                width is divided into the schedule duration.
  1891.  
  1892.                Example:
  1893.  
  1894.                Project duration is 160 days.  Entering a "90" will
  1895.                produce a barchart with activities represented in
  1896.                1.78 day segments of time.  This same schedule
  1897.                duration could produce a barchart represented by
  1898.                2_day segments of time, if 80 is entered instead.
  1899.                Any number up to 95 is acceptable for barchart width.
  1900.  
  1901.   Want whole project or Portion (W/P) _P_
  1902.  
  1903.            /*   For an example of a bar chart portion, see
  1904.                 below.
  1905.  
  1906.   Will several portions be placed together (Y/N/HELP)  _HELP_
  1907.  
  1908.  
  1909.  
  1910.  
  1911.  
  1912.  
  1913.  
  1914.  
  1915.  
  1916.  
  1917. è
  1918.  PC PROJECT MANAGEMENT              27                     USER'S MANUAL
  1919.  
  1920.  
  1921.  
  1922.  
  1923.   If you want to put several portions together, reply
  1924.   "Y".  PCPM will space activities within each portion so
  1925.   the activities which extend from one portion to another
  1926.   will be in alignment when the barcharts are placed side
  1927.   by side.
  1928.   Will several portions be placed together (Y/N/Help)  _Y_
  1929.  
  1930.   Enter beginning date in MMDDYY format  010483
  1931.  
  1932.     /*  The date entered must be after the start of the
  1933.         project, before the end of the project, and a
  1934.         "real" date (for instance, if you are using
  1935.         working days, the date cannot be a holiday or
  1936.         weekend).
  1937.  
  1938.   Enter ending date (MMDDYY) or length in days  140
  1939.   **** EACH COLUMN WILL REPRESENT 1.56 CALENDAR DAYS ****
  1940.   *** FORMING BAR CHART ***
  1941.   Want another Bar Chart from the same run (N/Y)  _N_
  1942.  
  1943.  
  1944.  
  1945.  
  1946.  
  1947.  
  1948.  
  1949.  
  1950.  
  1951.  
  1952.  
  1953.  
  1954.  
  1955.  
  1956.  
  1957.  
  1958.  
  1959.  
  1960.  
  1961.  
  1962.  
  1963.  
  1964.  
  1965.  
  1966.  
  1967.  
  1968.  
  1969.  
  1970.  
  1971.  
  1972.  
  1973.  
  1974.  
  1975.  
  1976.  
  1977.  
  1978.  
  1979.  
  1980.  
  1981.  
  1982.  
  1983. è
  1984.  PC PROJECT MANAGEMENT              28                     USER'S MANUAL
  1985.  
  1986.  
  1987.  
  1988.                          OPTION_8_-_SORT_OUTPUT
  1989.  
  1990.                          MENU OF PCPM PROGRAMS
  1991.  
  1992.               EXIT PCPM SYSTEM                           -  0
  1993.               INFORMATION                                -  1
  1994.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  1995.               ENTER/CHANGE INPUT FILE                    -  3
  1996.               ENTER/CHANGE HOLIDAYS                      -  4
  1997.               PERFORM CRITICAL PATH ANALYSIS             -  5
  1998.               PERFORM CASH FLOW ANALYSIS                 -  6
  1999.               PRODUCE BAR CHARTS                         -  7
  2000.               SORT OUTPUT                                -  8
  2001.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2002.               CHECK NODE NUMBERS                         - 10
  2003.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2004.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2005.               GENERATE CURRENT COST REPORT               - 13
  2006.               CHANGE ALL NODE NUMBERS                    - 14
  2007.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2008.  
  2009.   CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER   _8_
  2010.  
  2011.     /*  Output can be requested with data arranged in a variety of
  2012.          sorts.  The choices are listed in the sort menu.
  2013.  
  2014.    Enter the name of the input file [.CPM] _LLP_
  2015.    10  20  30  40  **** INPUT FILE READ ****
  2016.  
  2017.                               CHOICE OF SORTS
  2018.  
  2019.               NO SORT (RETURN TO MENU)                - 0
  2020.               FROM NODES                              - 1
  2021.               TO NODES                                - 2
  2022.               ESTIMATED DURATIONS                     - 3
  2023.               ACTUAL DURATIONS                        - 4
  2024.               EARLY START DATES                       - 5
  2025.               LATE START DATES                        - 6
  2026.               EARLY FINISH DATES                      - 7
  2027.               LATE FINISH DATES                       - 8
  2028.               FLOAT (CRITICAL PATH)                   - 9
  2029.               SUBCONTRACTOR CODE/NAME                 - 10
  2030.  
  2031.     Enter the number of your sort choice ? _5_
  2032.  
  2033.     **** SORTING 48 ACTIVITIES - TAKES 16 SECONDS IN REGULAR BASIC ****
  2034.     **** FINISHED SORT - FIGURING DAYS - TAKES 35 SECONDS ****
  2035.     **** DAYS FIGURED - READING SUBCONTRACTORS ****
  2036.     **** FILE LLP.SBC READ - 48 SUBCONTRACTORS READ ****
  2037.     Output Filename is LLP.SRT O.K. (Y/N) ? Y
  2038.  
  2039.      /*   In the example above, the activities will be sorted in
  2040.           order of early start dates.
  2041.  
  2042.  
  2043.  
  2044.  
  2045.  
  2046.  
  2047.  
  2048.  
  2049. è
  2050.  PC PROJECT MANAGEMENT              29                     USER'S MANUAL
  2051.  
  2052.  
  2053.  
  2054.      /*   The subcontractor name sort option groups all subs with
  2055.           the same name together on the printout in code, not
  2056.           alphabetical order.  If you wish each subcontractor
  2057.           to be listed on a separate printout, use Option 9
  2058.           of the Main Menu, "EXTRACT OUTPUT BY SUBCONTRACTOR."
  2059.  
  2060.                              CHOICE OF SORTS
  2061.  
  2062.               NO SORT (RETURN TO MENU)                - 0
  2063.               FROM NODES                              - 1
  2064.               TO NODES                                - 2
  2065.               ESTIMATED DURATIONS                     - 3
  2066.               ACTUAL DURATIONS                        - 4
  2067.               EARLY START DATES                       - 5
  2068.               LATE START DATES                        - 6
  2069.               EARLY FINISH DATES                      - 7
  2070.               LATE FINISH DATES                       - 8
  2071.               FLOAT (CRITICAL PATH)                   - 9
  2072.               SUBCONTRACTOR CODE/NAME                 - 10
  2073.  
  2074.      Enter the number of your sort choice ? 0
  2075.  
  2076.  
  2077.  
  2078.  
  2079.  
  2080.  
  2081.  
  2082.  
  2083.  
  2084.  
  2085.  
  2086.  
  2087.  
  2088.  
  2089.  
  2090.  
  2091.  
  2092.  
  2093.  
  2094.  
  2095.  
  2096.  
  2097.  
  2098.  
  2099.  
  2100.  
  2101.  
  2102.  
  2103.  
  2104.  
  2105.  
  2106.  
  2107.  
  2108.  
  2109.  
  2110.  
  2111.  
  2112.  
  2113.  
  2114.  
  2115. è
  2116.  PC PROJECT MANAGEMENT              30                     USER'S MANUAL
  2117.  
  2118.  
  2119.  
  2120.                OPTION_9_-_EXTRACT_OUTPUT_BY_SUBCONTRACTOR
  2121.  
  2122.                          MENU OF PCPM PROGRAMS
  2123.  
  2124.               EXIT PCPM SYSTEM                           -  0
  2125.               INFORMATION                                -  1
  2126.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2127.               ENTER/CHANGE INPUT FILE                    -  3
  2128.               ENTER/CHANGE HOLIDAYS                      -  4
  2129.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2130.               PERFORM CASH FLOW ANALYSIS                 -  6
  2131.               PRODUCE BAR CHARTS                         -  7
  2132.               SORT OUTPUT                                -  8
  2133.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2134.               CHECK NODE NUMBERS                         - 10
  2135.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2136.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2137.               GENERATE CURRENT COST REPORT               - 13
  2138.               CHANGE ALL NODE NUMBERS                    - 14
  2139.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2140.  
  2141.     CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER    _9_
  2142.  
  2143.     PROGRAM TO EXTRACT SPECIFIC SUBCONTRACTOR PCPM OUTPUT
  2144.  
  2145.     Enter the name of the input file ? _LLP_
  2146.     **** INPUT FILE READ ****
  2147.     Enter subcontractor code (0 to exit) ? 10
  2148.     Output File is LLP.KNO, O.K. (Y/N) ? Y
  2149.         /*   The data for each subcontractor selected appears in an
  2150.              output file named "filename.subname".  (LLP.KNO in this
  2151.              example.)  Each file contains only activities which are
  2152.              related to that contractor.
  2153.         /*   The system returns to Main Menu.
  2154.  
  2155.  
  2156.  
  2157.  
  2158.  
  2159.  
  2160.  
  2161.  
  2162.  
  2163.  
  2164.  
  2165.  
  2166.  
  2167.  
  2168.  
  2169.  
  2170.  
  2171.  
  2172.  
  2173.  
  2174.  
  2175.  
  2176.  
  2177.  
  2178.  
  2179.  
  2180.  
  2181. è
  2182.  PC PROJECT MANAGEMENT              31                     USER'S MANUAL
  2183.  
  2184.  
  2185.  
  2186.                      OPTION_10_-_CHECK_NODE_NUMBERS
  2187.  
  2188.                          MENU OF PCPM PROGRAMS
  2189.  
  2190.               EXIT PCPM SYSTEM                           -  0
  2191.               INFORMATION                                -  1
  2192.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2193.               ENTER/CHANGE INPUT FILE                    -  3
  2194.               ENTER/CHANGE HOLIDAYS                      -  4
  2195.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2196.               PERFORM CASH FLOW ANALYSIS                 -  6
  2197.               PRODUCE BAR CHARTS                         -  7
  2198.               SORT OUTPUT                                -  8
  2199.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2200.               CHECK NODE NUMBERS                         - 10
  2201.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2202.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2203.               GENERATE CURRENT COST REPORT               - 13
  2204.               CHANGE ALL NODE NUMBERS                    - 14
  2205.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2206.  
  2207.     CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _10_
  2208.  
  2209.     **** THIS MODULE PRINTS THE NODE NUMBERS USED IN A PROJECT ****
  2210.  
  2211.        /*   This option is useful to avoid duplication of
  2212.             node numbers.
  2213.  
  2214.     Enter the name of the input file [.CPM] ? _LLP_
  2215.     **** INPUT FILE READ ****
  2216.     **** SORTING NODES ****
  2217.     **** THE FOLLOWING NODE NUMBERS ARE USED IN: LLP.CPM ****
  2218.          500 510 520 530 550 560 570 580 585 587 590 597 600 620 625
  2219.          630 640 650 710 760 790 800 810 850 860 870 910 920 940 950
  2220.          955 957 960 970 **** CREATING FILE OF NODE NUMBERS ****
  2221.      **** LLP.NDS CREATED - USE OPTION 14 TO GLOBALLY CHANGE NODES ****
  2222.  
  2223.     **** CREATING FILE OF NODE NUMBERS - LLP.NDS ****
  2224.     **** FILE: LLP.NDS CREATED - USE OPTION 14 TO GLOBALLY
  2225.          CHANGE NODES ****
  2226.  
  2227.     Press ENTER to continue <CR>
  2228.  
  2229.  
  2230.  
  2231.  
  2232.  
  2233.  
  2234.  
  2235.  
  2236.  
  2237.  
  2238.  
  2239.  
  2240.  
  2241.  
  2242.  
  2243.  
  2244.  
  2245.  
  2246.  
  2247. è
  2248.  PC PROJECT MANAGEMENT              32                     USER'S MANUAL
  2249.  
  2250.  
  2251.  
  2252.            OPTION_11_-_GET_PRECEDENCE_OR_SUCCEEDENCE_DISPLAY
  2253.  
  2254.                          MENU OF PCPM PROGRAMS
  2255.  
  2256.               EXIT PCPM SYSTEM                           -  0
  2257.               INFORMATION                                -  1
  2258.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2259.               ENTER/CHANGE INPUT FILE                    -  3
  2260.               ENTER/CHANGE HOLIDAYS                      -  4
  2261.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2262.               PERFORM CASH FLOW ANALYSIS                 -  6
  2263.               PRODUCE BAR CHARTS                         -  7
  2264.               SORT OUTPUT                                -  8
  2265.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2266.               CHECK NODE NUMBERS                         - 10
  2267.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2268.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2269.               GENERATE CURRENT COST REPORT               - 13
  2270.               CHANGE ALL NODE NUMBERS                    - 14
  2271.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2272.  
  2273.     CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _11_
  2274.  
  2275.      /*  This option is used for diagnostic purposes to
  2276.          determine the cause of errors.
  2277.  
  2278.     Enter the name of the input file [.CPM] ? _LLP_
  2279.     10  20  30  40  **** INPUT FILE READ ****
  2280.     Enter Predecessor or Successor (P/S) P
  2281.     **** SORTING 48 ACTIVITIES **** FINISHED SORTING ****
  2282.     **** THE FOLLOWING INDICATES HOW MANY PRECEEDOR S EXIST FOR EACH
  2283.          ACTIVITY ****
  2284.  
  2285.     0 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 1
  2286.     1 1 1 1 1 2 1 1 1 1 2 1 7
  2287.  
  2288.     /*  These numbers may be ignored.  Each number stands for the
  2289.         number of preceedors (or succeedors) each activity has.
  2290.         For the actual preceedors, refer to the output file
  2291.         "BASENAME.PRE".
  2292.  
  2293.     **** PRECEEDOR DISPLAY CREATED AND EXISTS IN LLP.PRE ****
  2294.  
  2295.     Press ENTER to continue <CR>
  2296.  
  2297.     /*  System returns to Main Menu
  2298.  
  2299.  
  2300.  
  2301.  
  2302.  
  2303.  
  2304.  
  2305.  
  2306.  
  2307.  
  2308.  
  2309.  
  2310.  
  2311.  
  2312.  
  2313. è
  2314.  PC PROJECT MANAGEMENT              33                     USER'S MANUAL
  2315.  
  2316.  
  2317.  
  2318.             OPTION_12_-_CONVERT_WORKING_DAYS_TO_PROJECT_DAYS
  2319.  
  2320.                          MENU OF PCPM PROGRAMS
  2321.  
  2322.               EXIT PCPM SYSTEM                           -  0
  2323.               INFORMATION                                -  1
  2324.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2325.               ENTER/CHANGE INPUT FILE                    -  3
  2326.               ENTER/CHANGE HOLIDAYS                      -  4
  2327.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2328.               PERFORM CASH FLOW ANALYSIS                 -  6
  2329.               PRODUCE BAR CHARTS                         -  7
  2330.               SORT OUTPUT                                -  8
  2331.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2332.               CHECK NODE NUMBERS                         - 10
  2333.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2334.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2335.               GENERATE CURRENT COST REPORT               - 13
  2336.               CHANGE ALL NODE NUMBERS                    - 14
  2337.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2338.  
  2339.     CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _12_
  2340.  
  2341.     /*   This option creates a calendar of the project's
  2342.          life.  The start date becomes "Day 1" and each
  2343.          succeeding day is assigned a succeeding number.
  2344.          The user can request the Project Day for any
  2345.          individual day, or he can request a printout of the
  2346.          calendar for the entire project.
  2347.  
  2348.     Enter the name of the input file [.CPM] ? _LLP_
  2349.     **** INPUT FILE READ ****
  2350.     Enter project length (days) _140_
  2351.     **** READING HOLIDAY FILE: LLP.HOL ****
  2352.     **** CALCULATING DAYS - TAKES 60 SECONDS ****
  2353.     Want a Particular day, Whole printout, or End (P/W/E) _P_
  2354.     Enter the project day number _31_
  2355.         DAY 31 IS FEB0483
  2356.     Want a Particular day, Whole printout, or End (P/W/E) _W_
  2357.     **** LLP.DAY HAS BEEN CREATED ****
  2358.  
  2359.     Press ENTER to continue <CR>
  2360.  
  2361.        /*   System returns to Main Menu.
  2362.  
  2363.  
  2364.  
  2365.  
  2366.  
  2367.  
  2368.  
  2369.  
  2370.  
  2371.  
  2372.  
  2373.  
  2374.  
  2375.  
  2376.  
  2377.  
  2378.  
  2379. è
  2380.  PC PROJECT MANAGEMENT              34                     USER'S MANUAL
  2381.  
  2382.  
  2383.  
  2384.  
  2385.                 OPTION_13_-_GENERATE_CURRENT_COST_REPORT
  2386.  
  2387.                          MENU OF PCPM PROGRAMS
  2388.  
  2389.               EXIT PCPM SYSTEM                           -  0
  2390.               INFORMATION                                -  1
  2391.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2392.               ENTER/CHANGE INPUT FILE                    -  3
  2393.               ENTER/CHANGE HOLIDAYS                      -  4
  2394.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2395.               PERFORM CASH FLOW ANALYSIS                 -  6
  2396.               PRODUCE BAR CHARTS                         -  7
  2397.               SORT OUTPUT                                -  8
  2398.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2399.               CHECK NODE NUMBERS                         - 10
  2400.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2401.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2402.               GENERATE CURRENT COST REPORT               - 13
  2403.               CHANGE ALL NODE NUMBERS                    - 14
  2404.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2405.  
  2406.  
  2407.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _13_
  2408.  
  2409.      /*   This option generates a report of costs expended
  2410.           to date based on percentage of completion of each
  2411.           activity.  The output shows total monies spent per
  2412.           activity.  An example of the output (contained in
  2413.           BASEFILE.CST) is shown in the appendix.
  2414.  
  2415.       **** PROGRESS COST REPORT ****
  2416.  
  2417.      Enter the name of the input file [.CPM] _LLP_
  2418.      10  20  30  40  **** INPUT FILE READ ****
  2419.      **** FILE LLP.SBC READ - 48 SUBCONTRACTORS READ ****
  2420.      Want to suppress Zero-cost activities (Y/N) _Y_
  2421.  
  2422.      /*   Activities for which no costs have been incurred can
  2423.           be excluded from the output, if desired.
  2424.  
  2425.      TOTAL ESTIMATE =         0 AMOUNT EXPENDED =       0
  2426.  
  2427.      **** LLP.CST HAS BEEN CREATED ****
  2428.  
  2429.      Press ENTER to continue <CR>
  2430.  
  2431.      /*   System returns to Main Menu.
  2432.  
  2433.  
  2434.  
  2435.  
  2436.  
  2437.  
  2438.  
  2439.  
  2440.  
  2441.  
  2442.  
  2443.  
  2444.  
  2445. è
  2446.  PC PROJECT MANAGEMENT              35                     USER'S MANUAL
  2447.  
  2448.  
  2449.  
  2450.  
  2451.                   OPTION_14_-_CHANGE_ALL_NODE_NUMBERS
  2452.  
  2453.                          MENU OF PCPM PROGRAMS
  2454.  
  2455.               EXIT PCPM SYSTEM                           -  0
  2456.               INFORMATION                                -  1
  2457.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2458.               ENTER/CHANGE INPUT FILE                    -  3
  2459.               ENTER/CHANGE HOLIDAYS                      -  4
  2460.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2461.               PERFORM CASH FLOW ANALYSIS                 -  6
  2462.               PRODUCE BAR CHARTS                         -  7
  2463.               SORT OUTPUT                                -  8
  2464.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2465.               CHECK NODE NUMBERS                         - 10
  2466.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2467.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2468.               GENERATE CURRENT COST REPORT               - 13
  2469.               CHANGE ALL NODE NUMBERS                    - 14
  2470.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2471.  
  2472.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _14_
  2473.  
  2474.      /*  Option 14 automatically changes node numbers within
  2475.          a file.  This is useful when project expansion requires
  2476.          that new activities be added between existing activities
  2477.          where there is no node space available.  Option 14 can
  2478.          change the existing nodes in two ways:
  2479.  
  2480.          1)  By multiplying all the nodes by the same integer factor
  2481.          2)  An integer number can be selected to be added to all nodes
  2482.  
  2483.          Either or both methods may be used.
  2484.  
  2485.      Enter the name of the input file [.CPM] ? _LLP_
  2486.      20  40  **** INPUT FILE READ ****
  2487.      **** THIS MODULE ALLOWS YOU TO CHANGE NODES EITHER MATHEMATICALLY
  2488.      OR BY USING A [.NDS] FILE SET UP BY OPTION 10 OF THE MAIN MENU ****
  2489.  
  2490.      Change Mathematically, by [.NDS] File, or Quit (M/F/Q) ? M
  2491.      Enter amount to multiply to all nodes _20_
  2492.      **** MAXIMUM MULTIPLE IS 1.  TRY AGAIN (ENTER 1 FOR NO CHANGE) ****
  2493.  
  2494.          /*   The maximum multiple will vary for each project.
  2495.  
  2496.      Enter amount to multiply to all nodes _1_
  2497.      Enter amount to add to all nodes _0_
  2498.      **** FILE LLP.CPM UPDATED ****
  2499.  
  2500.      Press ENTER to continue <CR>
  2501.  
  2502.  
  2503.  
  2504.  
  2505.  
  2506.  
  2507.  
  2508.  
  2509.  
  2510.  
  2511. è
  2512.  PC PROJECT MANAGEMENT              36                     USER'S MANUAL
  2513.  
  2514.  
  2515.  
  2516.            OPTION_15_-_CONSOLIDATENUPDATEMFILE_TO_INPUT_FILE
  2517.  
  2518.                          MENU OF PCPM PROGRAMS
  2519.  
  2520.               EXIT PCPM SYSTEM                           -  0
  2521.               INFORMATION                                -  1
  2522.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2523.               ENTER/CHANGE INPUT FILE                    -  3
  2524.               ENTER/CHANGE HOLIDAYS                      -  4
  2525.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2526.               PERFORM CASH FLOW ANALYSIS                 -  6
  2527.               PRODUCE BAR CHARTS                         -  7
  2528.               SORT OUTPUT                                -  8
  2529.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2530.               CHECK NODE NUMBERS                         - 10
  2531.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2532.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2533.               GENERATE CURRENT COST REPORT               - 13
  2534.               CHANGE ALL NODE NUMBERS                    - 14
  2535.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2536.  
  2537.  
  2538.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _15_
  2539.  
  2540.      Enter the name of the input file [.CPM] ? LLP
  2541.       10  20  30  40  **** INPUT FILE READ ****
  2542.      File LLP updated - O.K. to write to disk (Y/N) ? Y
  2543.       10  20  30  40  **** FILE LLP.CPM UPDATED ****
  2544.  
  2545.        /* the system automatically returns to the main menu.
  2546.  
  2547.  
  2548.  
  2549.  
  2550.  
  2551.  
  2552.  
  2553.  
  2554.  
  2555.  
  2556.  
  2557.  
  2558.  
  2559.  
  2560.  
  2561.  
  2562.  
  2563.  
  2564.  
  2565.  
  2566.  
  2567.  
  2568.  
  2569.  
  2570.  
  2571.  
  2572.  
  2573.  
  2574.  
  2575.  
  2576.  
  2577. è
  2578.  PC PROJECT MANAGEMENT              37                     USER'S MANUAL
  2579.  
  2580.  
  2581.  
  2582.                       OPTION_0_-_EXIT_PCPM_SYSTEM
  2583.  
  2584.                          MENU OF PCPM PROGRAMS
  2585.  
  2586.               EXIT PCPM SYSTEM                           -  0
  2587.               INFORMATION                                -  1
  2588.               ENTER/CHANGE SUBCONTRACTOR/COMMENT FILE    -  2
  2589.               ENTER/CHANGE INPUT FILE                    -  3
  2590.               ENTER/CHANGE HOLIDAYS                      -  4
  2591.               PERFORM CRITICAL PATH ANALYSIS             -  5
  2592.               PERFORM CASH FLOW ANALYSIS                 -  6
  2593.               PRODUCE BAR CHARTS                         -  7
  2594.               SORT OUTPUT                                -  8
  2595.               EXTRACT OUTPUT BY SUBCONTRACTOR            -  9
  2596.               CHECK NODE NUMBERS                         - 10
  2597.               GET PRECEDENCE OR SUCCEEDENCE DISPLAY      - 11
  2598.               CONVERT WORKING DAYS TO PROJECT DAYS       - 12
  2599.               GENERATE CURRENT COST REPORT               - 13
  2600.               CHANGE ALL NODE NUMBERS                    - 14
  2601.               CONSOLIDATE UPDATE FILES TO INPUT FILES    - 15
  2602.  
  2603.      CHOOSE THE ACTION BY ENTERING THE CORRECT INTEGER _0_
  2604.  
  2605.  
  2606.      EXITING PCPM SYSTEM - GOODBYE FOR NOW
  2607.  
  2608.  
  2609.  
  2610.  
  2611.  
  2612.  
  2613.  
  2614.  
  2615.  
  2616.  
  2617.  
  2618.  
  2619.  
  2620.  
  2621.  
  2622.  
  2623.  
  2624.  
  2625.  
  2626.  
  2627.  
  2628.  
  2629.  
  2630.  
  2631.  
  2632.  
  2633.  
  2634.  
  2635.  
  2636.  
  2637.  
  2638.  
  2639.  
  2640.  
  2641.  
  2642.  
  2643. è
  2644.  PC PROJECT MANAGEMENT              38                     USER'S MANUAL
  2645.  
  2646.  
  2647.  
  2648.                      III.  IN_CASE_OF_SYSTEM_ERRORS
  2649.  
  2650.       As many  error  traps  as  possible  have  been included to insure
  2651.       efficient usage.  However, PCPM does not  check  every  item  each
  2652.       time in order to keep processing time at a minimum.
  2653.  
  2654.       If the  syStem  appears to  be "hung up", use the CTRL BREAK keys.
  2655.       Enter the system again and check for unconnected nodes, or illegal
  2656.       date usage.  The most common error is made  by  editing  the  data
  2657.       files outside the PCPM system and leaving out commas or putting in
  2658.       extra data.   The  simplest  solution is to perform editing within
  2659.       the PCPM system.
  2660.  
  2661.  
  2662.  
  2663.  
  2664.  
  2665.  
  2666.  
  2667.  
  2668.  
  2669.  
  2670.  
  2671.  
  2672.  
  2673.  
  2674.  
  2675.  
  2676.  
  2677.  
  2678.  
  2679.  
  2680.  
  2681.  
  2682.  
  2683.  
  2684.  
  2685.  
  2686.  
  2687.  
  2688.  
  2689.  
  2690.  
  2691.  
  2692.  
  2693.  
  2694.  
  2695.  
  2696.  
  2697.  
  2698.  
  2699.  
  2700.  
  2701.  
  2702.  
  2703.  
  2704.  
  2705.  
  2706.  
  2707.  
  2708.  
  2709. è
  2710.  PC PROJECT MANAGEMENT              39                     USER'S MANUAL
  2711.  
  2712.  
  2713.  
  2714.  
  2715.                                IV.  OUTPUT
  2716.  
  2717.       After exiting the PCPM system, output can be obtained by following
  2718.       the directions for your printer.
  2719.  
  2720.            A.  Primary_Output
  2721.  
  2722.                Primary output is a  list  of  all  activities  including
  2723.                their estimated duration, actual duration (if completed),
  2724.                early and  late start times, early and late finish times,
  2725.                float, actual reported  finish  date,  and  subcontractor
  2726.                name (or  any  comment)  associated  with  the  activity.
  2727.                There is also a complete listing  of  all  critical  path
  2728.                activities following  the  path(s)  from start to finish.
  2729.                Primary output can be arranged in a variety of  sorts  by
  2730.                utilizing Option 8.
  2731.  
  2732.  
  2733.            B.  Cash_Flow_Analysis_Output
  2734.  
  2735.                This analysis projects monies  to  be  expended  on  each
  2736.                activity during each month of the project.
  2737.  
  2738.  
  2739.            C.  Bar_Chart_Output
  2740.  
  2741.                PCPM outputs  a Gantt type bar chart showing the critical
  2742.                path, float and activity duration using early start times
  2743.                for each activity.
  2744.  
  2745.            D.  Current_Cost_Report
  2746.  
  2747.                This report shows total costs expended to date  for  each
  2748.                activity based on percentage of project completion.
  2749.  
  2750.            E.  Preceeder_or_Succeeder_Display
  2751.  
  2752.                This   report  shows  the  immediate   interrelationships
  2753.                between activities - which activity immediately  preceeds
  2754.                or succeeds  any  other activity as described by its from
  2755.                and to nodes.
  2756.  
  2757.  
  2758.  
  2759.  
  2760.  
  2761.  
  2762.  
  2763.  
  2764.  
  2765.  
  2766.  
  2767.  
  2768.  
  2769.  
  2770.  
  2771.  
  2772.  
  2773.  
  2774.  
  2775. è
  2776.  PC PROJECT MANAGEMENT              40                     USER'S MANUAL
  2777.  
  2778.  
  2779.  
  2780.                               V.  APPENDIX
  2781.  
  2782.                           A.  SAMPLE INPUT FORM
  2783.  
  2784.        -----------------------------------------------------------
  2785.                    FROM   TO   EST   REPORT  %  SUBCONTRACTOR ACT
  2786.        DESCRIPTION NODE  NODE  TIME  FINISH  DUN  CODE (NAME) COST
  2787.        -----------------------------------------------------------
  2788.  
  2789.        ___________________________________________________________
  2790.  
  2791.        ___________________________________________________________
  2792.  
  2793.        ___________________________________________________________
  2794.  
  2795.        ___________________________________________________________
  2796.  
  2797.        ___________________________________________________________
  2798.  
  2799.        ___________________________________________________________
  2800.  
  2801.        ___________________________________________________________
  2802.  
  2803.        ___________________________________________________________
  2804.  
  2805.        ___________________________________________________________
  2806.  
  2807.        ___________________________________________________________
  2808.  
  2809.        ___________________________________________________________
  2810.  
  2811.        ___________________________________________________________
  2812.  
  2813.        ___________________________________________________________
  2814.  
  2815.        ___________________________________________________________
  2816.  
  2817.        ___________________________________________________________
  2818.  
  2819.        ___________________________________________________________
  2820.  
  2821.        ___________________________________________________________
  2822.  
  2823.        ___________________________________________________________
  2824.  
  2825.        ___________________________________________________________
  2826.  
  2827.        ___________________________________________________________
  2828.  
  2829.        ___________________________________________________________
  2830.  
  2831.        ___________________________________________________________
  2832.  
  2833.        ___________________________________________________________
  2834.  
  2835.